| Introduction.
About the Authors.
1. The Construction Team.
2. Responsibility and Authority.
3. Safety on the Job.
4. Documentation: Records and Reports.
5. Measurement and Payment.
6. Paving and Surfacing.
7. Earthworks Inspection.
8. Underground Pipelines.
9. Inspection of Pipe Foundations.
10. Portland Cement Concrete Construction.
11. Waterstop Joints in Hydraulic Structures.
12. Steel Connections and Fasteners.
13. Protective Coating.
14. Project Closeout.
Bibliography.
Answers to End-of-Chapter Questions.
Index.
|